AQ/T 4219-2012Technical specification of dust and posion control for coking industry (English PDF)
焦化行业防尘防毒技术规范
AQ/T 4219 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| AQ/T 4219-2012 | Technical specification of dust and posion control for coking industry | Obsolete |
AQ/T 4219-2012 is obsolete. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for AQ/T 4219-2012 in 30 minutes.
Issued by
State Administration of Work Safety
Level / Type
National · Recommended
Issue date
March 31, 2012
Implementation date
September 1, 2012
Scope
AQ/T 4219-2012 is the English-translated version of 焦化行业防尘防毒技术规范.
AQ/T 4219-2012 is the Chinese industry standard "Technical specification of dust and posion control for coking industry". It was issued on March 31, 2012 by the State Administration of Work Safety, and took effect on September 1, 2012. It is obsolete: it has been withdrawn.
Found what you need?
Document preview — AQ/T 4219-2012
National Standard of the People's Republic of China
Issued by: State Administration of Work Safety
Contents
- Document data
1 Document data
Sector: National Recommended (industry standard).
Issuing body: State Administration of Work Safety.
Date of issue: 2012-03-31.
Date of implementation: 2012-09-01.
Status: obsolete, withdrawn.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download AQ/T 4219-2012
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
AQ/T 9004-2025 — Guidelines for developing enterprise safety culture
AQ/T 1120-2023 — Rules for the implementation of the coalbed methane surface exploitation construction project safety assessment upon completion
AQ/T 1121-2023 — Rules for the implementation of coal mine safety assessment in operation
AQ/T 4219-2012
$195.00