Valid

AQ 2030-2010Technical regulation for the tailings pond safety monitoring (English PDF)

尾矿库安全监测技术规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (13 pages)

Need quotation for your management?

Get a formal quotation for AQ 2030-2010 in 30 minutes.

Issued by

State Administration of Work Safety

Level / Type

National · Mandatory

Issue date

September 6, 2010

Implementation date

May 1, 2011

Scope

AQ 2030-2010 is the English-translated version of 尾矿库安全监测技术规范.

AQ 2030-2010 — This standard specifies the plant and its safe operation of the tailings are directly related to construction (structures) and other safety monitoring principles, contents and requirements.

This specification applies to the PRC in the use of metal and nonmetal mineral concentrator tailings, alumina plant red mud libraries.

Found what you need?

Document preview — AQ 2030-2010

National Standard of the People's Republic of China

ICS
73.020
Classification
D 09

Issued by: State Administration of Work Safety

Contents

  • What this standard covers1
  • Document data2

What this standard covers

This standard specifies the plant and its safe operation of the tailings are directly related to construction (structures) and other safety monitoring principles, contents and requirements. This specification applies to the PRC in the use of metal and nonmetal mineral concentrator tailings, alumina plant red mud libraries. Other industrial waste stockpiling wet and dry processing library tailings may refer to.

Document data

International classification (ICS): 73.020.

Chinese classification (CCS): D09.

Estimated length of the Chinese original: 20,253 words.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 13 pages — is available in the English PDF.

How to Download AQ 2030-2010

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
13 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

AQ 2030-2010

$195.00